Storage is blocked in this browser, so progress will not be saved. Everything else still works.
Module 1 · Nov 26 to Dec 1
SRE fundamentals
SLIs, SLOs, error budgets and toil, the shared vocabulary of every SRE conversation.
0 of 5 bursts done
Concept in plain words
An SLI is a measured ratio: good events divided by valid events, such as successful payment API calls over all payment API calls. An SLO is the target for that ratio over a window, for example 99.9% over four rolling weeks. An SLA is a contract with consequences; if missing it costs nothing, it is really an SLO. The error budget is 100% minus the SLO: at 99.9% and 3 million requests in four weeks, you may fail 3,000. Spend the budget on shipping. When it runs out, reliability work comes first. Toil is manual, repetitive, automatable work with no lasting value that grows with traffic. Google's goal keeps it under 50% of each SRE's time. Your SQL background maps straight onto this: an SLI is a query you already know how to write.
Payments analogy: An error budget works like a card's credit limit for failure. You can spend it on risky launches, but once it is maxed out, new spending (releases) stops until the balance recovers.
Banking scenario
What the source says
Evernote's first SLO was an uptime measure: 99.95% uptime measured over a monthly window, set for certain services and methods.
They used a third-party prober, outside their own environment, that polled their frontend nodes every minute from multiple locations in North America and Europe. A node was marked down only after a second, geographically separate prober also failed.
They could not assume users knew about published maintenance windows. Uninformed users would experience those windows as unexplained downtime, so the SLO calculations treated maintenance windows as downtime.
Source: SLO Engineering Case Studies, SRE Workbook ch. 3 needs internet
Illustrative scenario
A card authorization service runs a planned database maintenance window from 01:00 to 01:30 every Sunday. Internal dashboards exclude the window, so the monthly report shows 99.99%. Meanwhile, overnight card-present transactions at fuel stations and online subscription renewals are declined during that half hour, and cardholders call in.
What an SRE would have seen first: Not an alert: a spike in declined-authorization counts and call-center contacts every Sunday night, while the internal availability number stayed green.
The control that would have caught it: An SLI measured from the customer side (an external prober or the authorization outcome itself) that counts planned maintenance as bad minutes, plus an error budget policy that makes the maintenance cost visible to the product owner.
Made-up payments translation for study. Not a real event at any company.
Thresholds
| Setting | Starting value | Source |
|---|---|---|
| SLO window | 4-week rolling, whole weeks | Workbook ch. 2 needs internet |
| Number of SLI types per service | 5 or fewer | Workbook ch. 2 needs internet |
| Downtime allowed at 99.5% / 99.9% / 99.95% / 99.99% per 30 days | 216 / 43.2 / 21.6 / 4.32 minutes Computed: plain arithmetic, (1 − SLO) × 43,200 minutes. Not a published figure. | estimate |
| Tiered availability starting points | 99.5% new or internal, 99.9% most systems, 99.95% revenue-critical, 99.99% shared infrastructure | Home Depot case, Workbook ch. 3 needs internet |
| Latency SLI | 90th percentile minimum; 95th or 99th for user-facing | Home Depot case, Workbook ch. 3 needs internet |
| Freeze trigger | Budget exceeded over the past 4 weeks: halt all changes except P0 and security fixes | Example error budget policy needs internet |
| Postmortem trigger | One incident uses more than 20% of the 4-week budget | Example error budget policy needs internet |
| Toil cap | Below 50% of each SRE's time (Google averages about 33%) | SRE book ch. 5 needs internet |
| Internal vs external target | Internal SLO tighter than the one you publish, as a safety margin | SRE book ch. 4 needs internet |
Rows marked estimate have no published source. Test them against your own traffic.
Quiz
Try it
Phone Pick a public service you use daily (a transit app, a streaming site), not anything at work. Write a one-page SLO doc.
- Two SLIs, availability and latency, each written as good events / valid events.
- A target and a 28-day window for each.
- The error budget in minutes.
- What happens when the budget runs out.
You keep: Your SLO one-pager. Keep it; it becomes the base of the capstone.
Verify notes
- The downtime minutes row is computed arithmetic, labeled estimate here because the schema only allows a source or an estimate. Check the math yourself: (1 − SLO) × 43,200.
- The workbook says current performance is a fine place to start; the SRE book warns against locking in a target just because you hit it today. Start from today's number, then argue it toward what users need.
- The analogy and the illustrative scenario are mine, not from a source.
Read these
- Embracing Risk, SRE book ch. 3 needs internet
- Service Level Objectives, SRE book ch. 4 needs internet
- Eliminating Toil, SRE book ch. 5 needs internet
- Implementing SLOs, SRE Workbook ch. 2 needs internet
- Example Error Budget Policy, Workbook appendix needs internet
- SLO Engineering Case Studies, Workbook ch. 3 needs internet
From your Sourced Reading Guide. Reading times in that guide are estimates.
Companion book estimate
Becoming a Rockstar SRE needs internet, Jeremy Proffitt and Rod Anami (Packt Publishing, April 28, 2023)
- Ch. 2: Fundamental Numbers - Reliability Statistics. SLI, SLO and the reliability numbers this module computes (the feature list names SLO, SLI, MTBF, MTTR, MTTD).
Dynatrace translation: In Dynatrace, the SLI is a DQL query and the SLO adds a target and period on top of it (Dynatrace SLO docs). - Publisher's summary: "Reduce toil and leverage root cause analysis to enhance efficiency and reliability". The toil half of this module.
Mapped from chapter titles and the publisher's feature list only; I have not read the book, so treat each link as an estimate. Chapters 8 to 17 were not listed on the pages I opened. The book is from April 2023, so it predates the 2025 incidents and API docs used here; its code repo's software list names Prometheus and Grafana and does not name Dynatrace.